A factory redevelopment project must be considered a strategic moment to make enduring gains in efficiency and profitability. Progima recently helped Mecan-Hydro redevelop their factory and streamlined their operations to optimize their facilities and enhance their output.

OUR CONTRIBUTION
TO THEIR GROTH MOMENTUM

EXPECTED RESULTS

+ 300%

Increased capacity

+ 35%

Increased productivity

- 50%

Shorter lead time

Our intervention

Mecan-Hydro faced numerous problems related to a lack of space, which resulted in operational inefficiencies. The Progima team developed an innovative layout and revised production operations. Working with Mécan-Hydro, we created a new work organization adapted to the plant's increased capacity and projected volumes. The results exceeded expectations: reduction of unnecessary handling, elimination of production stoppages, optimization of space and improved production flows. Today, the new plant exemplifies efficiency and performance.

About Mecan-Hydro

Since 1994, Mecan-Hydro has been recognized as a leading supplier of mechanical solutions and equipment for all types of dams, including hydroelectric power plants and water management dams.

"In addition to an optimal layout for our new plant, we were able to benefit from formative advice on work organization and waste. We are now better positioned to meet the growing needs of the hydroelectric industry."